ERP for assembly and OEM manufacturers Every sub-part tied to its assembly.
An assembly ships on time only when every part under it is ready. WindFire creates the jobs for the made sub-parts with the assembly job, schedules them first and shows what is still missing.
Save the assembly job and WindFire creates a job for each manufactured sub-part in its bill of materials, copying each part's own steps and scaling the quantities. Documents lists the assembly traveler first, then each sub-part traveler in bill-of-materials order.
Assembly jobTraveler 1
Sub-part jobTraveler 2
Sub-part jobTraveler 3
Sub-part jobTraveler 4
Sub-part jobTraveler 5
Sub-part jobTraveler 6
Stock and purchased partsMaterial requirements on the assembly job
How WindFire structures an assembly job. The number of sub-parts is an example.01
Multi-level bills of materials
Build the assembly in its setup guide: add every part that goes into it, including any base part. Each sub-part made here needs its own confirmed bill of materials, and nested manufactured parts get their own jobs and travelers. Changing a submitted assembly creates a new revision for future jobs; existing jobs keep theirs.
02
Make or buy, part by part
Each part says whether it is manufactured here. Made sub-parts become their own jobs; stock and purchased components stay as material requirements on the job. Purchased shortages become draft purchase requests, and what to buy never orders the same material twice.
03
Material readiness before release
Release job shows Ready, Warnings or Blockers. Available stock is reserved automatically, a short material shows where else it is in stock, and a production manager must give a reason to release with warnings.
04
Production scheduling for OEM assemblies
The schedule makes the sub-part jobs first: the assembly's own steps start only after all its manufactured sub-part jobs are finished. A job's first step is not planned before its missing material can be here, using the earliest open purchase order date or the material's lead time.
05
Assembly work order tracking
Submitting the assembly job submits its draft sub-part jobs first, and releasing it releases them too. On the Jobs list an assembly shows its sub-part jobs indented under it, and operators record each step in WindFire Tracker.
06
Inspections at the job step
With the Quality inspections module on, each inspection records what was checked, the readings and whether it passed. Choose the job step as the reference to inspect a job's parts. If a required inspection stops a step from finishing by itself, the step keeps a note until you finish it.
A FEW GOOD QUESTIONS
Assembly and OEM questions
Does WindFire support multi-level bills of materials?
Yes. An assembly lists every part that goes into it. Each sub-part made here has its own confirmed bill of materials, materials, method and traveler, and nested manufactured parts get their own jobs and travelers.
How are sub-part jobs connected to the assembly job?
Saving an assembly job creates independent jobs for its made sub-parts. Submitting or releasing the assembly also submits or releases them, and the Jobs list shows them under the assembly.
Will the schedule build sub-parts before the assembly?
Yes. The assembly's own steps start only after all its manufactured sub-part jobs are finished, and a job's first step is not planned before its missing material can be here.
How do we see what is missing before releasing an assembly job?
Release job shows Ready, Warnings and Blockers. Available stock is reserved automatically, purchased shortages become draft purchase requests, and made components keep their own jobs.