Inventory Management for Small Manufacturers: A Guide
A practical inventory guide for small manufacturers: accurate records, locations, reorder points, safety stock, counting and the numbers to track.
Read the guideGUIDES
Plain-language guides for small manufacturers, each with the formula, a worked example and the common mistakes. Free to read, no sign-up.
A practical inventory guide for small manufacturers: accurate records, locations, reorder points, safety stock, counting and the numbers to track.
Read the guideLearn how to calculate safety stock with three formulas, from a quick max-minus-average method to the statistical Z-score method, with worked numbers.
Read the guideThe reorder point formula explained: lead time demand plus safety stock. Worked examples for purchased and made parts, plus common mistakes to avoid.
Read the guideHow to calculate economic order quantity with the EOQ formula, a step-by-step manufacturing example, and when EOQ does not fit your situation.
Read the guideHow to calculate inventory turnover and days of inventory for a manufacturer, with a worked example by raw material, WIP and finished goods.
Read the guideHow to calculate supplier, manufacturing and customer lead time, measure the average and variability from history, and use the result in planning.
Read the guideHow small manufacturers can use kanban: two-bin systems, how to calculate the number of kanban cards, card design, and when kanban is the wrong fit.
Read the guideCycle counting best practices: how to set count frequency with ABC classes, size the daily workload, run blind counts, set tolerances and fix root causes.
Read the guideHow to plan and run a physical inventory count in a manufacturing shop: preparation, tags, blind counts, cut-off, recounts and posting adjustments.
Read the guideHow to do ABC analysis for inventory: calculate annual usage value, rank items, set A/B/C cut-offs and use the classes for counting and buying.
Read the guideHow to measure and reduce inventory shrinkage in a manufacturing shop: shrink rate formula, the real causes (most are process errors) and fixes.
Read the guideHow to set up a bin location system in a stockroom or small warehouse: naming conventions, label design, barcodes vs QR codes, fixed vs random.
Read the guideFIFO vs LIFO vs weighted average explained with one worked example: cost of goods sold, ending inventory, profit effect and the accounting rules to know.
Read the guideA worked bill of materials example for a manufactured product: single-level vs multi-level BOMs, scrap allowances, cost roll-up and common BOM mistakes.
Read the guideWork order vs production order vs manufacturing order vs job: what each term means, how they relate to sales orders and job cards, with an example.
Read the guideMRP vs ERP explained in plain English: what each system does, a worked MRP netting example, and how a small manufacturer can decide which it needs.
Read the guideHow to calculate job cost in a manufacturing shop: materials, labor and applied overhead, with a worked example and an estimate-vs-actual review.
Read the guideTakt time vs cycle time vs lead time explained with formulas and a worked line-balancing example: find the bottleneck and how many operators you need.
Read the guideHow to calculate OEE (overall equipment effectiveness) step by step: availability, performance and quality, with a worked example and how to use it.
Read the guideCapacity planning for small manufacturers: calculate available and rated capacity, compare load by work center, find bottlenecks and fix overloads.
Read the guideWork the formulas from these guides with your own numbers.
See all toolsInventory list, cycle count, physical count, BOM and production schedule spreadsheets.
Get the templatesShort definitions of 70 terms.
Open the glossaryWHEN A SPREADSHEET STOPS BEING ENOUGH
WindFire connects sales orders, jobs, scheduling, inventory, purchasing, the shop floor and accounting in one system.