REPLENISHMENT GUIDE
Reorder point formula: when to order, with worked examples
A reorder point (ROP) is the stock level that tells you it is time to place a new order. When on-hand plus on-order inventory falls to that level, you order, and the new stock should arrive just as you would otherwise start running short. It is the backbone of most small-manufacturer replenishment, and the formula is simple once the inputs are right.
The reorder point formula
Reorder point = (average daily usage × lead time in days) + safety stock
The first part, usage times lead time, is called lead time demand: what you expect to consume while you wait for the order. Safety stock covers the times when usage runs higher or the order runs late.
Example 1: a purchased component
- Average daily usage: 40 units (working days)
- Supplier lead time: 9 working days
- Safety stock: 60 units (calculated in our safety stock guide)
Lead time demand = 40 × 9 = 360 units. Reorder point = 360 + 60 = 420 units.
When stock available for this part reaches 420, place an order. If everything goes to plan, you will use 360 units over the next 9 days and have about 60 left when the delivery arrives.
Example 2: no safety stock
For a part with very steady usage and a dependable local supplier, some shops run with zero safety stock. If usage is 15 units a day and lead time is 2 days, ROP = 15 × 2 + 0 = 30 units. This works only when both numbers really are stable; one late delivery means a stockout.
Example 3: a part you make in-house
For a manufactured sub-assembly, the "lead time" is your own manufacturing lead time: time to release the job, wait in queue, set up, run and move it to stock. Suppose:
- Usage by final assembly: 25 per day
- Manufacturing lead time: 4 days
- Safety stock: 30
ROP = 25 × 4 + 30 = 130 units. When stock falls to 130, release a new job. If the shop is overloaded and queue time grows, the real lead time grows too, and your ROP must follow it.
Working with weekly numbers
You can use any time unit as long as usage and lead time share it. A part used 200 per week with a 3-week lead time and 150 units of safety stock: ROP = 200 × 3 + 150 = 750 units. Mixing a daily usage figure with a lead time in weeks is the single most common ROP error.
Use "available", not just "on hand"
Compare the reorder point to inventory position, not to what is physically on the shelf:
Inventory position = on hand + on order − allocated (reserved for open jobs or orders)
Say you have 380 on hand, 0 on order and 50 already reserved for released jobs. Position = 380 + 0 − 50 = 330, which is below the 420 ROP, so you order now. Looking only at the 380 on the shelf, you would have waited and come up short. Equally, if an order of 500 is already on its way, do not order again just because the shelf count is low.
How much to order when you hit the reorder point
The reorder point answers when. The order quantity answers how much. Common choices:
- Fixed quantity: often the economic order quantity. See our EOQ guide.
- Order up to a maximum: order enough to bring the position back to a set maximum (min/max replenishment).
- Supplier constraints: round to the minimum order quantity, pack size or pallet quantity.
Make sure the order quantity is larger than lead time demand. If you order less than you use during the lead time, you will be below the reorder point again the moment the delivery lands.
Getting the inputs right
- Usage: average the last 13 to 26 weeks of issues to production or sales. Remove one-off spikes. If the product is seasonal, use a forecast instead of a flat average.
- Lead time: measure actual order-to-receipt time from recent purchase orders, not the quoted figure. Include your own internal steps: approving the PO, receiving and inspecting. Our lead time calculation guide covers this.
- Safety stock: calculate from the variability you see, then review quarterly.
Try your own figures in the reorder point calculator.
Mistakes that break reorder points
- Stale inputs. A reorder point set two years ago reflects two-year-old demand.
- Inaccurate stock records. If unrecorded scrap or unposted issues leave the system higher than the shelf, you order late. Counting regularly fixes this.
- One ROP for all locations. If you stock the same part in two warehouses with different usage, each needs its own reorder level.
- Ignoring calendar effects. Plant shutdowns and supplier holidays stretch lead times. Raise ROPs ahead of them.
Reorder point vs min/max
A min/max system is a reorder point system with a specific order rule. The minimum is the reorder point. When the position falls to or below the minimum, you order enough to reach the maximum. With a minimum of 420 and a maximum of 1,200, a position of 400 triggers an order for 800.
Frequently asked questions
What is the reorder point formula?
Reorder point = average daily usage × lead time in days + safety stock. Use the same time unit for usage and lead time.
Can the reorder point be lower than safety stock?
No. The reorder point always includes safety stock, so it is equal to it only when lead time demand is zero.
Should I compare the reorder point to on-hand stock?
Compare it to inventory position: on hand plus on order minus quantities already reserved. Otherwise you may double order or order too late.
How often should reorder points be updated?
Review them at least quarterly, and whenever usage, supplier lead time or pack sizes change.