REPLENISHMENT GUIDE
Economic order quantity (EOQ): formula, example and limits
Economic order quantity (EOQ) is the order size that keeps the combined cost of placing orders and holding inventory as low as possible. Order too often and you pay for purchasing time, freight and receiving over and over. Order too much at once and cash, space and the risk of obsolete stock pile up. EOQ finds the balance point.
The EOQ formula
EOQ = √( 2 × D × S / H )
- D = annual demand in units
- S = cost to place and receive one order (purchasing time, freight fixed charges, receiving and inspection, invoice processing)
- H = cost to hold one unit for one year
Holding cost is usually expressed as a percentage of unit cost per year. It covers the cost of capital, storage space, insurance, handling, shrinkage and the risk the part becomes obsolete. Work out your own figure with your accountant rather than borrowing a generic percentage; the example below uses 25% purely for illustration.
Worked example
A shop buys a machined bushing:
- Annual demand (D): 12,000 units
- Cost per order (S): $75
- Unit cost: $12; holding rate 25% per year, so H = $12 × 0.25 = $3.00 per unit per year
- 2 × D × S = 2 × 12,000 × 75 = 1,800,000
- Divide by H: 1,800,000 / 3 = 600,000
- Square root: √600,000 = 774.6
EOQ ≈ 775 units. That is about 12,000 / 775 = 15.5 orders a year, roughly one every three and a half weeks.
Checking the result
At the EOQ, annual ordering cost and annual holding cost are equal. Let us confirm:
- Annual ordering cost = (D / Q) × S = (12,000 / 775) × $75 = 15.48 × $75 = $1,161
- Annual holding cost = (Q / 2) × H = (775 / 2) × $3 = 387.5 × $3 = $1,163
- Total ≈ $2,324 a year (the small gap comes from rounding Q)
Compare two other order sizes:
| Order size | Orders/year | Ordering cost | Holding cost | Total |
|---|---|---|---|---|
| 250 | 48 | $3,600 | $375 | $3,975 |
| 775 (EOQ) | 15.5 | $1,161 | $1,163 | $2,324 |
| 2,000 | 6 | $450 | $3,000 | $3,450 |
The total cost curve is flat near the bottom. Ordering 700 or 850 instead of 775 changes the total by only a few dollars, so you can round to a pack size or pallet quantity without losing much. Run your own numbers in the EOQ calculator.
How to estimate the cost per order (S)
Add up the costs that happen once per order, regardless of quantity:
- Buyer time to raise, approve and follow up a purchase order (minutes × loaded hourly rate)
- Fixed freight or delivery charges per shipment
- Receiving, inspection and putaway time per delivery
- Accounts payable time to match and pay the invoice
For example: 30 minutes of buyer time at $40/hour ($20), a $35 delivery charge, 20 minutes receiving at $36/hour ($12) and 12 minutes of accounts payable at $40/hour ($8) gives S = $75.
EOQ for parts you make: economic production quantity
For in-house parts, S becomes the setup cost: machine downtime and labor to change over, first-piece inspection and any scrap during setup. A two-hour setup at a $90/hour shop rate costs $180 per run. Higher setup costs push the economic batch size up, which is why reducing setup time is such a powerful lever: it lets you run smaller batches economically. (A refined version, the economic production quantity, also accounts for parts being used while the batch is still running.)
When EOQ does not fit
EOQ assumes steady demand, a fixed unit price, and that the whole order arrives at once. Adjust or set it aside when:
- Quantity discounts apply. Calculate total annual cost (purchase + ordering + holding) at each price break and pick the lowest.
- Demand is lumpy or seasonal. Order for specific requirements instead of a fixed quantity.
- Shelf life or engineering changes make large quantities risky.
- Space or cash is limited. The math may say 2,000; your rack may hold 500.
- Supplier minimums or pack sizes force a different quantity.
EOQ and the reorder point work together
EOQ tells you how much to order; the reorder point tells you when. For the bushing, with 48 units a day used over 250 working days, a 5-day lead time and 50 units of safety stock, the reorder point is 48 × 5 + 50 = 290. When available stock reaches 290, order 775. Larger order quantities also lower how often stock turns over, which you can track with the inventory turnover ratio.
Frequently asked questions
What does EOQ stand for?
Economic order quantity: the order size that minimizes the combined yearly cost of ordering and holding inventory.
What is a typical holding cost percentage?
It varies by business, interest rates and storage costs. Estimate yours from the cost of capital, storage, insurance, handling, shrinkage and obsolescence rather than using a generic figure.
Does EOQ work with quantity discounts?
Not directly. Compare the total annual cost, including purchase price, at each price break and choose the lowest total.
Should I round the EOQ?
Yes. Total cost changes very little near the EOQ, so rounding to a pack size, pallet or supplier minimum is usually fine.