OEE calculation: how to measure overall equipment effectiveness
Overall equipment effectiveness (OEE) measures how much of a machine's planned production time is truly productive: making good parts, at full speed, without stopping. It combines three losses into one percentage and, more usefully, shows which of the three is costing you the most. This guide explains the formula and works through a full shift.
The OEE formula
OEE = Availability × Performance × Quality
- Availability = run time / planned production time. Captures stops: breakdowns, setups, waiting for material.
- Performance = (ideal cycle time × total count) / run time. Captures running slower than the ideal speed, including small stops.
- Quality = good count / total count. Captures scrap and parts needing rework.
Worked example: one shift on a CNC lathe
- Shift length: 480 minutes
- Planned breaks: 30 minutes
- Unplanned downtime and setups: 45 minutes
- Ideal cycle time: 1.0 minute per part
- Total parts made: 360
- Rejected parts: 18, so good parts = 342
Step 1: availability
Planned production time = 480 − 30 = 450 minutes. Run time = 450 − 45 = 405 minutes.
Availability = 405 / 450 = 90.0%
Step 2: performance
At the ideal speed, 360 parts would take 360 × 1.0 = 360 minutes. The machine ran for 405.
Performance = 360 / 405 = 88.9%
Step 3: quality
Quality = 342 / 360 = 95.0%
Step 4: OEE
OEE = 0.900 × 0.889 × 0.950 = 76.0%
Check it the simple way
OEE also equals good parts at ideal speed divided by planned time:
OEE = (good count × ideal cycle time) / planned production time
(342 × 1.0) / 450 = 0.760 = 76.0%. The two methods always agree, which is a useful check on your data. In plain terms, of 450 planned minutes, 342 minutes' worth of good parts came out. The other 108 minutes were lost.
Where the time went
| Loss | Minutes | Explanation |
|---|---|---|
| Availability loss | 45 | Downtime and setups |
| Performance loss | 45 | 405 run minutes − 360 minutes of ideal output |
| Quality loss | 18 | 18 rejected parts × 1.0 min |
| Total loss | 108 | 450 − 342 |
This breakdown is the point of OEE. Here, availability and performance losses are equal. Breaking down performance losses often reveals many short stops (a jammed bar feeder, an operator away for a minute) that never get written down as downtime.
The six big losses
OEE losses are often grouped into six categories:
- Availability: equipment failures; setups and adjustments.
- Performance: idling and minor stops; reduced speed.
- Quality: process defects; reduced yield at startup.
Record the reason for each stop, even roughly, so you know which category to attack first.
Getting the ideal cycle time right
Performance depends entirely on the ideal cycle time you choose. Use the fastest proven time for that part on that machine, from the machine's design rate or the best sustained run you have recorded. If you use a padded standard time instead, performance can exceed 100%, which is a sign the standard is wrong.
Is my OEE good?
Published "world-class" targets exist, but OEE varies widely with product mix, batch sizes and how each plant defines planned time and ideal cycle time. A job shop with frequent changeovers will score lower than a dedicated line making one part, even if both are well run. Compare a machine with itself over time, define the terms once, and focus on the largest loss.
OEE vs TEEP
OEE only looks at planned production time. If the lathe runs one 8-hour shift a day, the other 16 hours do not count against it. Total effective equipment performance (TEEP) uses all calendar time instead: TEEP = OEE × (planned production time / total calendar time). For our shift, 450 planned minutes out of 1,440 in a day gives 0.760 × 450 / 1,440 = 23.75%. TEEP is useful when deciding whether to add a shift before buying another machine, because it shows how much unused time the existing machine still has.
Using OEE in a small shop
- Start with your bottleneck machine. An hour gained there is an hour of extra output for the whole shop. An hour gained on a machine with spare capacity gains nothing.
- Collect simple data. Planned time, downtime with a reason, total count and reject count per shift. A clipboard works to start.
- Review weekly and pick one loss to reduce, such as setup time, a recurring breakdown or a scrap cause.
- Feed the result into planning. If a machine really delivers 76% of its planned time, your capacity plan should reflect that rather than assuming 100%.
OEE pairs naturally with takt and cycle time: takt tells you the pace you need, and OEE tells you how much of your machine time actually delivers it. To see how lost time translates into capacity, try the takt time and capacity calculator.
Frequently asked questions
What is the OEE formula?
OEE = availability × performance × quality. It can also be calculated as good count × ideal cycle time / planned production time.
What is included in planned production time?
The time the machine is scheduled to run, which is shift time minus planned stops such as breaks. Unplanned stops stay in, because they count as availability losses.
Why is my performance over 100%?
Your ideal cycle time is probably too slow. Use the fastest proven cycle time for that part and machine.
Which machines should I measure first?
Start with your bottleneck. Improving it increases the output of the whole shop.