FREE PRODUCTION TOOL

Takt time and production capacity calculator

Find the pace your line must keep to meet demand, how many stations or operators that takes, and what your current setup can make in a day.

Free, no sign-up. Published by Windfire Admin · Updated November 17, 2026

Available time
Your process (optional)

What it means

Takt time is the pace of customer demand: the available production time divided by the number of units customers need in that time. If a unit leaves the line every takt period, you meet demand without overproducing.

Cycle time is how long one unit actually takes at a station. When the cycle time is longer than takt, you need parallel stations, more operators or a faster process. The efficiency figure lets you allow for changeovers, small stops and quality checks. A load near or above 100% means the plan has no room for problems.

The formula

Available time = (shift length − breaks) × shifts per day

Takt time = available time ÷ customer demand

Stations needed = cycle time ÷ takt time, rounded up

Units per station per day = available time × efficiency ÷ cycle time, rounded down

Worked example

Two 480-minute shifts with 30 minutes of breaks each, customer demand of 540 units a day, a cycle time of 240 seconds and 85% efficiency.

  1. Available time = (480 − 30) × 2 = 900 minutes = 54,000 seconds
  2. Takt time = 54,000 ÷ 540 = 100 seconds per unit
  3. Stations needed = 240 ÷ 100 = 2.4, so 3
  4. Units per station = 54,000 × 0.85 ÷ 240 = 191.25, so 191; three stations make 573 a day, enough for 540 (load 94.1%)

FREQUENTLY ASKED

Questions and answers

What is the difference between takt time and cycle time?

Takt time comes from customer demand: how often a unit must be finished. Cycle time comes from the process: how long a unit actually takes. You want cycle time per station at or below takt time.

Should breaks and meetings be removed from available time?

Yes. Remove planned breaks, meetings and planned maintenance. Leave unplanned stops in the efficiency figure instead.

What efficiency should I use?

Use your measured figure if you have one (for example from overall equipment effectiveness). If not, 80 to 90% is a common planning assumption for a running process.

Does takt time apply to job shops?

It fits repetitive work best. In a job shop with varied routings, the same arithmetic helps check whether a workstation has enough hours for the week's load.

WHEN A SPREADSHEET STOPS BEING ENOUGH

A schedule that knows each workstation's hours

WindFire's scheduler places released operations within each workstation's working hours and capacity, in step order, and protects work already underway.

Learn the method

More free tools