Bill of materials example: building a multi-level BOM step by step
A worked bill of materials example for a manufactured product: single-level vs multi-level BOMs, scrap allowances, cost roll-up and common BOM mistakes.
Read the guideFREE PRODUCTION TOOL
Add up what one unit really costs to make: components with scrap allowance, labor and overhead, then multiply by the batch.
A cost roll-up adds the cost of every component in a bill of materials (BOM), allowing for the material lost to scrap, then adds the labor and overhead needed to make one unit. The result is the standard cost you quote from and compare actual job costs against.
For a multi-level assembly, roll up each sub-assembly first and enter its cost per unit as one component line in the parent. Outside processing such as plating or powder coating can go in as a component line too.
Extended cost = quantity per unit × unit cost × (1 + scrap % ÷ 100)
Cost per unit = sum of extended costs + labor per unit + overhead per unit
Batch total = cost per unit × batch quantity
A welded frame uses 2.5 m of tube at $4.20/m with 5% scrap, 2 plates at $3.10, 8 fasteners at $0.12 and outside powder coating at $6.50. Labor is 0.75 h at $38/h = $28.50 and overhead is $9.00 per unit.
Material = $24.685; cost per unit = 24.685 + 28.50 + 9.00 = $62.19; a batch of 50 = $3,109.25.
FREQUENTLY ASKED
It is the total cost of one finished unit, built up from the cost of every component in its bill of materials plus the labor and overhead to make it.
Enter the share of material you expect to lose (offcuts, setup pieces, rejects) as a scrap percentage on that line. The calculator increases the extended cost accordingly.
Work from the bottom up: roll up each sub-assembly on its own, then use its cost per unit as a component line in the next level.
No. The calculation runs in your browser. Use Download CSV to keep a copy.
WHEN A SPREADSHEET STOPS BEING ENOUGH
WindFire supports simple parts and multi-level assemblies, and job costing shows cost to date and the estimate to finish against each job's original estimate, flagging jobs whose margin falls below your target.
A worked bill of materials example for a manufactured product: single-level vs multi-level BOMs, scrap allowances, cost roll-up and common BOM mistakes.
Read the guideHow to calculate job cost in a manufacturing shop: materials, labor and applied overhead, with a worked example and an estimate-vs-actual review.
Read the guideTakt time, stations needed and daily capacity from shift time, demand and cycle time.
Open the toolTurnover ratio and days of inventory from cost of goods sold and beginning and ending inventory.
Open the toolEconomic order quantity: the order size that balances ordering cost against holding cost.