Bill of materials example: building a multi-level BOM step by step
A worked bill of materials example for a manufactured product: single-level vs multi-level BOMs, scrap allowances, cost roll-up and common BOM mistakes.
Read the guideFREE TEMPLATE
An indented, multi-level BOM layout with extended cost, scrap allowance, revision, reference positions and approved alternates.
Free, no email or sign-up. Sample rows are made up; delete them before you start.
| Column | What goes in it |
|---|---|
| Level | 0 for the finished item, 1 for its direct components, 2 for theirs, and so on. |
| Item number, description | The component and what it is. |
| Qty per parent, unit of measure | Quantity needed for one of the item directly above it, and how it is measured. |
| Make / Buy | Whether you make it in-house or buy it (drop-down list). |
| Unit cost, scrap % | What one unit costs and the share you expect to lose to scrap or yield. |
| Extended cost | Calculated: qty × unit cost × (1 + scrap %). |
| Revision, reference / position, notes | The revision, reference designators or positions, and approved alternates. |
The .xlsx file has the extended cost formula, a material cost total, drop-down lists, indenting by level and a How to use sheet. For labor and overhead, use the free BOM cost roll-up calculator. The .csv file has the same columns.
FREQUENTLY ASKED
A bill of materials that lists sub-assemblies and their own components underneath them, level by level, down to purchased parts.
The quantity needed to make one unit of the item directly above it, not one finished product. Multiply down the levels for totals.
Either cost its components on the lines below it, or enter its rolled-up cost on its own line. Do not do both, or the cost is counted twice.
No. The sample cart assembly is made up. Delete it before you start.
WHEN A SPREADSHEET STOPS BEING ENOUGH
WindFire supports simple parts and multi-level assemblies, with independent child jobs for components made in-house, and job costing that compares cost to date with each job's original estimate.
A worked bill of materials example for a manufactured product: single-level vs multi-level BOMs, scrap allowances, cost roll-up and common BOM mistakes.
Read the guideFree inventory list template for Excel and Google Sheets: SKU, location, quantity, unit cost, total value, reorder point and an automatic reorder flag. No email.
Get the templateFree cycle count sheet for Excel and Google Sheets: system vs counted quantity, variance, variance % and value, and an automatic recount flag against your tolerance.
Get the templateFree production schedule template for Excel and Google Sheets: jobs, workstations, start and due dates, hours, status, priority and an automatic late flag.
Get the templateFree physical inventory count sheet for Excel and Google Sheets: prenumbered tags, location, item, unit of measure, count, recount and final count. No email.
Get the templateReorder point, safety stock, turnover, EOQ, takt time, BOM cost and bin labels.
See all tools