FREE INVENTORY TOOL

Safety stock calculator

Size the buffer stock that protects you from late deliveries and busy weeks. Pick the method that matches the data you have.

Free, no sign-up. Published by Windfire Admin · Updated November 17, 2026

Method
Max minus average

What it means

Safety stock is the extra quantity you keep so that a late delivery or a spike in usage does not stop production or a shipment. Too little and you run out; too much and cash sits on the shelf.

Max minus average needs no statistics: it covers the worst usage and the worst lead time you have seen. Demand variability uses the standard deviation of daily usage and a target service level (the chance of not running out during a replenishment cycle). Demand and lead time variability also accounts for suppliers whose lead times vary.

The formula

Max minus average: SS = (max daily usage × max lead time) − (average daily usage × average lead time)

Demand variability: SS = Z × σdaily usage × √(average lead time)

Combined: SS = Z × √(average lead time × σdaily usage² + average daily usage² × σlead time²)

Z is the standard normal value for the service level: about 1.28 for 90%, 1.645 for 95%, 1.96 for 97.5% and 2.33 for 99%. The calculator works it out for any level you enter.

Worked example

Average usage is 40 a day (standard deviation 12), the most ever used in a day is 60, lead time averages 7 days (standard deviation 2, longest 10), and the target service level is 95% (Z = 1.645).

  • Max minus average: 60 × 10 − 40 × 7 = 600 − 280 = 320
  • Demand variability: 1.645 × 12 × √7 = 1.645 × 12 × 2.646 = 52.2, so keep 53
  • Combined: 1.645 × √(7 × 12² + 40² × 2²) = 1.645 × √7,408 = 1.645 × 86.07 = 141.6, so keep 142

The worst-case method gives the biggest buffer. The statistical methods let you choose how much protection you pay for.

FREQUENTLY ASKED

Questions and answers

Which safety stock method should I use?

If you do not have usage history, start with max minus average. If you can export daily usage, the demand variability method lets you choose a service level. If your supplier lead times also vary a lot, use the combined method.

What service level should I pick?

Many shops use 90 to 95% for ordinary parts and 98 to 99% for parts that stop a line or a key customer order. Each step up costs more stock, and the cost rises faster near 100%.

How do I get the standard deviation of daily usage?

Export daily usage for a few months into a spreadsheet and use the STDEV.S function on that column. Use the same time unit (days) as the lead time.

How does safety stock relate to the reorder point?

The reorder point is demand during lead time plus safety stock. Enter the result from this page into the reorder point calculator.

WHEN A SPREADSHEET STOPS BEING ENOUGH

Keep the buffer where the floor can find it

WindFire keeps stock by warehouse and storage location, down to shelves, drawers and bins, with replenishment defaults for made and purchased items and a purchasing view of what needs buying.

Learn the method

More free tools